Photo of NIPR-LPM (VLF) in JARE-47 in 2005-2007
H100
H100: Dec. 29, 2005; Construction in the summer operation
Skallen
Skallen: Jan. 13-17, 2006; Construction in the summer operation
H100: Aug. 21, 2006, on the way to Middle point
H100: Sep. 15, 2006, on the way back from Middle point
Skallen: Sep. 21-23, 2006; Check & re-start operation after polar night